Quick answer: measure every pipe length, not just the two ends. Use a level with a block, a string line, or a laser and grade rod, compare each reading to the minimum for your pipe size, and look for any length that reads flat or backward between two good ones. Fix it while the trench is open, and write the readings down.

Once the trench is filled, a pipe that is a quarter inch out is a camera inspection and a jackhammer. Ten minutes with a level before the backfill goes in is the cheapest check on the whole job. Here are four ways to do it, from most to least trustworthy.

1. A level and a block

Set a block of the right height under the downhill end of your level. When the bubble reads level, the pipe is on grade.

Target slope2-ft level4-ft level6-ft level
⅛ in/ft (about 1%)¼ in½ in¾ in
¼ in/ft (about 2%)½ in1 in1½ in

A longer level averages out small bumps in the pipe wall. Check on the barrel of the pipe, not on a hub or fitting.

2. A string line

Pull a string tight between two stakes, level it with a line level, and measure down to the top of the pipe at each end of a section. The difference between the two measurements is the drop. Over 10 feet, ¼ inch per foot is 2½ inches and ⅛ inch per foot is 1¼ inches.

3. A laser and grade rod

With the laser set up and left alone, read the rod on the pipe at two points. The lower point gives the larger reading. Subtract, and divide by the distance between the two points.

Example: rod readings of 4.25 ft and 4.67 ft, taken 20 feet apart. The drop is 0.42 ft, which is 5 inches. Five inches over 20 feet is ¼ inch per foot.

4. A phone on the pipe

A calibrated phone level reads slope directly and is the fastest way to walk a run and find the suspect length. Phone sensors are approximate, about ±1 to 2 degrees, so treat it as a way to find problems, then confirm any reading near the minimum with one of the methods above.

What to look for

Keep a record

  1. In Pipe Slope Calculator, open the job and tap Add Reading under Site Readings, or lock a reading in the level and tap Save.
  2. Choose how it was measured: spirit or torpedo level, laser and grade rod, string line, or phone sensor.
  3. Add a note such as "at the cleanout". For a planned run, enter the measured slope on each segment to see it beside the design slope.
  4. Share the job report. Site readings are listed on their own page with the method used for each.

A reading taken with a level, laser or string line is checked against the code minimum for the pipe size. A phone reading is always marked approximate and is never shown as meeting the minimum.

Reference only: many jurisdictions require an inspection before a drain is covered, and some want the pipe left exposed to a set height. Ask your local authority what must be visible and what must be tested before you backfill.

Related questions

How often should I check the slope along a drain?

Check every pipe length, or roughly every 10 feet. Measuring only the two ends hides a sag in the middle.

How do I check slope with a 4-foot level?

Put a block under the downhill end: 1 inch for ¼ inch per foot, ½ inch for ⅛ inch per foot. When the bubble reads level, the pipe is on grade.

Can I use my phone to check slope for an inspection?

Use it to find problems quickly. Phone sensors are approximate, so confirm any reading near the minimum with a level, string line or laser.

What is a belly in a drain line?

A low spot where one section sags below the line of the pipe. It holds water and solids even when the overall fall is correct.

Record what you measured on site

Save each reading to the job with the method used, and share one PDF report. Offline, on iPhone and iPad.

Download on the App Store